SL Steam Locomotive - KG3 C61 Kagoshima Main Line - Fighting with remaining strength as retirement approaches
Go to next photo Go to previous photo
SL Steam Locomotive - KG3 C61 Kagoshima Main Line - Fighting with remaining strength as retirement approaches
SL Steam Locomotive - KG3 C61 Kagoshima Main Line - Fighting with remaining strength as retirement approaches

SL Steam Locomotive - KG3 C61 Kagoshima Main Line - Fighting with remaining strength as retirement approaches

13.20 $
Description
1973 C61 19 Struggling with remaining power near retirement on the Kagoshima Main Line

[C61 19 History]
1949-07 Mitsubishi Heavy Industries Mihara modification (D511027) Assigned to Tokyo Bureau, stationed at Oku Depot
1949-12 Oku Depot → Taira Depot
1950-08 Taira Depot → Oku Depot (Stoker installed)
1954-10 Oku Depot → Shirakawa Depot → Morioka Depot → Sendai Depot → Aomori Depot
1971-09 Aomori Depot → Miyazaki Depot
1973-11 Scrapped (Miyazaki Depot) Mileage: Approx. 2,570,000 km
1978-01 Loaned free of charge between Kagoshima Railway Bureau Director and Kokubu Mayor
2016-04 Continues to be preserved outdoors in Shiroyama Park

A4 size photo, framed
Height 31.5 cm, Width 23.0 cm, Wall-mounted / Stand type
Original artwork

#Photo
#Steam Locomotive
#SL
#C61 19
#Kagoshima Main Line
Details
Category
Art Of Art
Condition
New/unused
Shipping
Included in price (by seller)
From
Kanagawa
video
Delivery in 24/48 h

SHIPPINGS

Free shipping in Spanish mainland, Balearic Islands and Portugal.

For other countries the shipping cost will be paid by the client.

DELIVERY TIME (as of delivery)

Spanish mainland, Balearic Islands and Portugal: 1-2 working days.

Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.

Free returns

The return period is 14 calendar days from the receipt of the order.

Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.